Metal Maintenance were contracted by Veolia Water to dismantle and Refurbish Gravity Thickener at the Luggage Point Advanced Wastewater Treatment Plant.

Scope of Works:

The works included:

  • Fully dismantle and remove gravity thickener,
  • Sandblast, and paint all components,
  • Reinstall all components,
  • Realign the rake and drive,
  • Mechanical service of the drive gearbox.

Challenges:

Some Challenges included:

  • Confined space entry,
  • Working at height, and
  • Working from a man box.

Conclusion/Outcome:

Task was completed as per the client scope of work and put back in service, Veolia Water was happy with the outcome.