Machine Fitting and Fabrication
Mechanical fitting and maintenance
Mechanical fitting of equipment and systems by minimising downtime and implementing cost effective strategies for maintenance.
Pipework and tubing including:
- Tube bending through to major plant rebuilds.
- Installation and maintenance of pipe and tube systems.
- Flexible conduit installation.
- Swagelock instrument tubing.
The team brings extensive experience and high level skills in working with pipe and tube systems in:
- Stainless steel
- PE
- PVC
- UPVC
- CPVC
- ABS
Our Capabilities
- Technical recommendations and maintenance planning for industrial plants. This covers minimising down-time and implementing cost effective strategies for maintenance.
- Mechanical fitting of equipment and systems in new and brownfield sites.
- Pump installation, maintenance and rectification.
- Horizontal laser alignment of pumps and drives.
- High pressure pump inspections and rebuilds.
- Welding services including SAF welding, certified and specialist welding.
- Working with super duplex materials.
- Dosing lines.
- Maintenance of oil transfer units
- Oil filtration of hydraulic units.
- Hazardous and confined space installation and maintenance.
- Emergency and breakdown maintenance services provided 24/7 to clients.
Recent Machine Fitting and Fabrication Projects
Heinemann Rd Reservoirs 2 & 3 – Roof Gutters and Stormwater Works
Metal Maintenance designed and constructed roof gutters and stormwater systems for Heinemann Road Reservoirs 2 & 3 and flooring replacement at Heinemann Road Pump Station.
High Pressure Pump Overhaul
Metal Maintenance was required dismantle and conduct durability inspections of the high-pressure pumps at the Gold Coast Desalination Plant.
Kooralbyn Water Treatment Plant – Temporary Storage Tanks
Supply and install 3 x water tanks for temporary storage while work was carried out on the roof on the main storage reservoir.
Mudgeeraba Water Treatment Plant – Repair Filter Outlet Assemblies
The filter outlet pipework assembly and isolation valve spindles (12 in total) at Mudgeeraba Water Treatment Plant required replacement.
Mount Crosby East Bank WPS – Refurbishment of Intake Screen
The refurbishment of these 2 intake screens will allow the plant to continue to meet the required performance to provide a reliable and long-term system for effectively collecting debris in the raw water intake tunnels.
Fluoride Hopper Shut Off Valve Install
Concept design of gate valve that eliminates the manual handling associated with a manually operated valve. The fluoride powder sits in the valve slide and makes it difficult to close.